Pharmaceutical Warehouse
Full HVAC package for a pharmaceutical warehouse — air handling, ductwork and chilled water distribution engineered for regulated storage.

- Client
- Sanofi
- Sector
- Pharmaceutical
- Year
- 2021
- Consultant
- ECC
Scope of works
- HVAC works
- Ductwork
- AHU installation
- Chilled water network
Smart Construction Group delivered the complete HVAC package for Sanofi's pharmaceutical warehouse, executed under consultant ECC. The scope covered HVAC works, ductwork fabrication and installation, AHU installation and the chilled water network serving the facility.
Pharmaceutical storage is a regulated environment where the mechanical systems are part of compliance, not merely comfort. Temperature stability, air distribution and system reliability all bear directly on product integrity, so air handling units, duct routing and chilled water distribution have to be engineered, installed and balanced to specification. SCG maintained cleanliness discipline through installation and coordinated ductwork against structure and services before fabrication, delivering a system built to perform consistently for a client operating to international pharmaceutical standards.